Quantcast
Channel: SCN : Discussion List - SAP BusinessObjects Design Studio
Viewing all articles
Browse latest Browse all 4041

Using DS App Before Background Processing has Finished Leads to Chart Rendering Failure

$
0
0

Hi All,

 

I've been a long time DS SCN lurker, but decided to finally break my silence to ask for some assistance with the issue detailed below.

 

I have set up a very basic background processing scenario. The app consists of 1 cross-tab (DS_1) and 1 chart (DS_2). DS_2 is loaded in script (TRUE) on start-up. Below I show the two cases that present themselves when running the App.

 

CASE 1: I wait until both datasources are loaded. The result of course is as expected:

 

BGP - App not in use.png

 

CASE 2: I used the horizontal scroll-bar on the crosstab before DS_2 (or the background processing) completes loading and rendering. The result is a weird one (or maybe not if I am missing something). If the scroll bar is used, DS_2 completes loading, but, the chart does not render at all:

 

BGP - App used before BG finihes.png

 

Has anyone seen something like this,  or does anyone have a good explanation for the above behaviour?

 

System specs:

Design studio - 1.5 (no SP's)

BIP - 4.1 SP4

Datasources - BEx queries built on multiprovider (running BW on HANA)

 

Many thanks in advance revered community and please shout if i can give more information to help you help me.

 

Kind Regards,

Matt


Viewing all articles
Browse latest Browse all 4041

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>