Hello everyone,
I have a requirement to create a design studio application with a pie chart to show several measures.
It means that I have several different measures and I want to let each piece of the pie chart present 1 measure.
For example, I need to combine measure1 ,measure2, measure3(which correspond KeyFigures in Bex query) into 1 pie chart and there should have 3 pieces.I tried change swap axis option and put all measures into row, not works.